c

Construction of the syntethic surface at the Strachowice airport

Additional information

For the whole period of investment Skanska has cooperated with the business unit in Czech Republic. A special concrete mixer that produces1,000 cubic meters a day of concrete  was brought from our Czech business unit. Our colleagues from the Czech Republic were responsible for the execution of an apron concrete pavement. For the bituminous surface of the taxiway Bravo, service road and other Works made within the conract were executed by Skanska Poland.
 

Project in figures:

  • replacement of ground: 2340cubic meters
  • excavations: 64508cubic meters
  • embankments: 755 cubic meters

Result

loading