c

Tunnel Sitina, Bratislava

Additional information

Skanska has executed the following tunneling and construction works on tunnel:

  • The construction of temporary portals for tunnel driving
  • Complete driving of both tunnels tubes
  • Scaling of tunnel tubes cross-section
  • Hydro-insulation execution
  • Concreting of secondary lining and application of protective coating on tunnel walls
  • Concreting of interior structures and cement-concrete road surface.

Result

loading