Rebuilding of the streets Podwale Grodzkie - Waly Jagiellonskie in Gdansk, section Waly Piastowskie

  • Podwale Grodzkie - Waly Jagiellonskie in Gdansk
  • Podwale Grodzkie - Waly Jagiellonskie in Gdansk
  • Podwale Grodzkie - Waly Jagiellonskie in Gdansk
  • Podwale Grodzkie - Waly Jagiellonskie in Gdansk

The scope of works within the contract included modernization of streets on the 800 m long section alongside with all the media. New walkways and bicycle paths have also been constructed, and the following have been renovated: tramway track 1,8 km long, two engineering objects: pedestrian tunnels near the railway station (84 m long, iternal diameter 3 m x 11 m) and the widest bridge in Gdańsk - Radunia Channel crossing (of average length 10,5 m and width of 151 m). The rank of the investment is displayed by the fact that daily over 80,000 cars drives through the rebuilt section.