c

Eiriksdal og Makkoren Kraftlag

Sustainability and green

Construction of two new power stations in rock to replace three, old power stations (total production of approx 340 GWh).

The work includes; 6 km tunnels of cross-section 20 to 36 sq.m., two power stations, intakes, two bridges, outlets and a portal building together with other river-preventive work. 

Result

loading